Compliance Report

4 compliant · 4 partial · 1 non-compliant · period FY2026
Operator
Mari Energies Limited
Reporting period
01 Sep 2025 – 31 Aug 2026
Prepared
28 Aug 2026
ClauseRequirementEvidenceConformanceVerdict
49 CFR 192.465(a) Test stations surveyed at least once per calendar year, interval ≤ 15 months 2,342 of 2,491
94%
Partial
49 CFR 192.465(a) Rectifiers inspected 6× per calendar year, interval ≤ 2 months 86 of 141
61%
Non-compliant
49 CFR 192.465(d) Deficiencies corrected within a reasonable time 217 of 251 actions
86%
Partial
49 CFR 192.469 Sufficient test stations for electrical measurement 2,491 installed, 3 damaged
99%
Compliant
49 CFR 192.491 Corrosion control records retained for the life of the pipeline Complete
100%
Compliant
AMPP SP0169 §6.2 Protection criterion applied and documented per structure 2,491 of 3,061 surveyed
81%
Partial
NACE SP0207 CIPS performed to procedure with GPS-synchronised interruption 418 km of 581 km
72%
Partial
NACE SP0502 Coating defects classified and prioritised by %IR 287 indications classified
100%
Compliant
ISO 15589-1 §7 Anode bed capacity reviewed against remaining design life 7 beds, 3 flagged
100%
Compliant
Material finding. Rectifier inspection frequency is non-compliant with 49 CFR 192.465(a) — 47 units exceeded the 2-month interval. This is the single largest exposure in the period and drives corrective actions CA-1041, CA-1043 and CA-1044.