●Compliance Report
4 compliant · 4 partial · 1 non-compliant · period FY2026Operator
Mari Energies Limited
Reporting period
01 Sep 2025 – 31 Aug 2026
Prepared
28 Aug 2026
| Clause | Requirement | Evidence | Conformance | Verdict |
|---|---|---|---|---|
| 49 CFR 192.465(a) | Test stations surveyed at least once per calendar year, interval ≤ 15 months | 2,342 of 2,491 | 94% |
Partial |
| 49 CFR 192.465(a) | Rectifiers inspected 6× per calendar year, interval ≤ 2 months | 86 of 141 | 61% |
Non-compliant |
| 49 CFR 192.465(d) | Deficiencies corrected within a reasonable time | 217 of 251 actions | 86% |
Partial |
| 49 CFR 192.469 | Sufficient test stations for electrical measurement | 2,491 installed, 3 damaged | 99% |
Compliant |
| 49 CFR 192.491 | Corrosion control records retained for the life of the pipeline | Complete | 100% |
Compliant |
| AMPP SP0169 §6.2 | Protection criterion applied and documented per structure | 2,491 of 3,061 surveyed | 81% |
Partial |
| NACE SP0207 | CIPS performed to procedure with GPS-synchronised interruption | 418 km of 581 km | 72% |
Partial |
| NACE SP0502 | Coating defects classified and prioritised by %IR | 287 indications classified | 100% |
Compliant |
| ISO 15589-1 §7 | Anode bed capacity reviewed against remaining design life | 7 beds, 3 flagged | 100% |
Compliant |
Material finding. Rectifier inspection frequency is
non-compliant with 49 CFR 192.465(a) — 47 units exceeded the
2-month interval. This is the single largest exposure in the period and drives