Corrovision © 2026 All Rights Reserved
Corrovision Cathodic Protection Management System
Annual plan, CIPS, DCVG and rectifier checks. Schedule the year, capture the field readings, close each visit against the plan.
Every structure classified fully, partially or unprotected against the −850 mV instant-OFF criterion, with the evidence behind it.
Transformer-rectifiers, groundbeds, sacrificial anodes and bonds. Output, energised state and remaining anode life.
The remedial work that moves a structure back to fully protected, split into immediate, short-term and long-term horizons.
Regulatory intervals per 49 CFR 192.465, audit trail and exportable survey reports for the regulator and the client.
Pipelines, storage tanks, well casings and flowlines with coating history, install date, design code and CP scheme.
Test posts and defects plotted along chainage. Potential profile against the criterion line, defect severity by location.
Leading and lagging indicators with target, actual and RAG banding. Board-level view of programme health.